Customization: | Available |
---|---|
Application: | Power |
Phase: | Three |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
S11-M-30~2500/20-10 fully sealed oil-immersed transformer is suitable for AC 50Hz, rated working voltage 10kV, 20kV and below power system, as petroleum, metallurgy, chemical, textile, light industry and other enterprises and large dust places of the distribution transformer.
Structural feature
Iron core
The core is cold rolled silicon steel sheet with high permeability magnetic grain orientation. The iron core is a core type iron core, the full oblique joint stacking type iron core, the iron core column is a multi-step circular cross-section, the iron bar and the iron core are equal cross-section.
winding
The winding adopts corrugated oil channel, no paint dipping process, and tight tape binding; The windings are concentric coils: the high voltage winding has a tap required for the tap voltage, which is led to the tap switch, the switch is installed on the box cover, and the voltage transfer of 10kV and 20KV can be achieved after the power is cut off, and the tap voltage is changed.
Safety protection device
30~2000kVA transformer equipped with pressure relief valve:
Gas relays with alarm and tripping terminals can be installed according to user requirements;
Oil temperature measuring device
The transformer is equipped with a glass thermometer tube base, the tube base is located on the top of the tank, and extends into the oil 120 10mm;
1000~2000kVA transformer equipped with outdoor signal thermometer;
Transformer tank
The transformer oil tank is composed of corrugated wall, and the surface is sprayed with dust and the paint film is firm. The corrugated heat sink not only has a cooling function, but also has a "breathing" function, and the elasticity of the corrugated heat sink can compensate for the change in the volume of transformer oil caused by the temperature rise and fall. Therefore, the fully sealed transformer has no oil storage tank, reducing the overall height of the transformer;
When the transformer is packaged, the vacuum oiling process is used to completely remove the moisture in the transformer, and the transformer oil does not contact with the air. Effectively prevent oxygen and moisture from invading the transformer, which may lead to the deterioration of transformer insulation performance and transformer oil aging, so oil sample tests are carried out from time to time:
Rated capacity (kVA) | High voltage(KV) | Voltage Combination | Connective group label | No-load loss(KW) | Load loss(KW) | No-load current(%) | Short circuit impedance (%) | Weight (KG) | ||
High pressure tap range | Low voltage(KV) |
|
Total weight | |||||||
30 | 20/10 | ±5*2.5% ±2*2.5% |
0.4 | Dyn11 | 0.09 | 0.66 | 2.1 | 5.5 | 180 | 420 |
50 | 0.13 | 0.96 | 2.0 | 150 | 495 | |||||
63 | 0.15 | 1.145 | 1.9 | 170 | 560 | |||||
80 | 0.18 | 1.37 | 1.8 | 190 | 635 | |||||
100 | 0.2 | 1.65 | 1.6 | 215 | 710 | |||||
125 | 0.24 | 1.98 | 1.5 | 250 | 840 | |||||
160 | 0.29 | 2.42 | 1.4 | 285 | 945 | |||||
200 | 0.33 | 2.86 | 1.3 | 340 | 1125 | |||||
250 | 0.4 | 3.35 | 1.2 | 390 | 1295 | |||||
315 | 0.48 | 4.01 | 1.1 | 445 | 1475 | |||||
400 | 0.57 | 4.73 | 1.0 | 515 | 1712 | |||||
500 | 0.68 | 5.66 | 1.0 | 6.0 | 460 | 1995 | ||||
630 | 0.81 | 6.82 | 0.9 | 565 | 2450 | |||||
800 | 0.98 | 8.25 | 0.9 | 635 | 2765 | |||||
1000 | 1.15 | 11.33 | 0.7 | 840 | 3650 | |||||
1250 | 1.35 | 13.2 | 0.7 | 970 | 4220 | |||||
1600 | 1.63 | 15.95 | 0.6 | 1105 | 4800 | |||||
2000 | 1.95 | 19.14 | 0.6 | 1205 | 5240 | |||||
2500 | 2.34 | 22.22 | 0.5 | 1300 | 5650 |
ABOUTUS
Shenheng Power Equipment CO.,LTD is a company specializing in the production of high and low voltage switch power transmission and distribution equipment and high, low voltage electrical components, one of the professional production enterprises, the production of all fully insulated and fully sealed inflatable cabinet intelligent solid insulation ring main unit,outdoor high voltage cable branch box,box-type substation, etc. Product quality is stable, reliable, It is deeply trusted and approved by the customers.
Manufacturing of the main products are YBW box-type substation KYN61-40.5,KYN28A-24,KYN28A-12,XGN2-10,HXGN-10 high voltage switch gear,XGN ring net cabinet SHSRM inflatable ring main unit,SHSG solid ring main unit,MNS.GCS,GCS,GGD,XL low voltage switch gear,vacuum circuit breaker,oil immersed transformer,dry type transformer current /potential transformer,load break switch and other power transmission and distribution equipment.
For a long time also for all kinds of metallurgy,ship building,electric power,mining, and intelligent buildings. high-rise buildings, hospitals, schools and other industries to provide high quality power transmission and distribution of complete sets of equipment and electrical control equipment.The company has a strong technical force, sophisticated technology and sophisticated testing methods, and the products sell well across the country.
1.Are you a trading company or a manufacturer?
We are a professional factory with 10 years of experience in the field of high and low voltage switch gear and substation. Transformers, cables, distribution boxes and various electrical equipment, such as vacuum circuit breakers, load breaking switches, etc. Our factory is an excellent supplier of the State Grid Corporation of China.
2.Do you accept custom service?
We provide OEM/ODM services, according to your drawings and parameters, our professional technical and national team can provide satisfactory solutions.
3.What is your minimum order quantity?
Our minimum order quantity is 1 piece.
4.What is your lead time?
It depends on your product requirements and quantity. It usually takes 5-10 working days.
5.How do you solve quality problems?
Please provide detailed photos of the quality problem. Our technical and quality inspection departments have done a good analysis. We'll come up with a satisfactory solution within two days.
6.What are your terms of payment?
T/T payment can negotiate the balance of deposit.Western Union, letter of credit is also acceptable.