Type: | High-voltage |
---|---|
Structure: | Three-column Disconnector |
Installation: | Indoor High-voltage |
Operation: | Electric |
Grounding Mode: | Grounding |
Movement Mode: | Horizontal Rotary Type |
Customization: |
---|
Suppliers with verified business licenses
GN19-12(C)type indoor high voltage isolation relationship high voltage switchgear ,used for rated voltage 12kV,AC 50Hz and below power system,with CS6-1 type manual operation mechanism,as in the case of voltage and no load,division,circuit use,there are also derivative products anti-pollution type,plateau type and installed live display device.
The isolation switch of this system is equipped with CS6-1 type manual operating mechnism(the isolation switch with panel is its own connected operating mechanism ) .
This series of isolation switch is three-pole type,which is composed of bottom frame,rotating shaft,lever ,porcelain pillar insulator,gate knife and terminal board.The rotationg shaft is arranged on the bottom frame,and there are three pairs of levers welded on it .The lever pass through the porcelain insulator of the pull rod and the necklace of the gata knife .The rotating shaft extends out of the bottom frame,and any section of it can be connected with the operating mechnism.
Item | Unit | Parameters | ||||||||
Rated voltage | kV | 12 | ||||||||
1 min power frequency withstand voltage | Over the groud | kV | 42 | |||||||
Fracture | kV | 48 | ||||||||
Lightning impulse withstand voltage(peak) |
Over the groud | kV | 75 | |||||||
Fracture | kV | 85 | ||||||||
Rated frequency | Hz | 50 | ||||||||
Rated current | A | 400 | 630 | 1000 1250 | ||||||
Rated short time withstand current | kA | 16 | 20 | 16 | 20 | 25 | 20 | 25 | 31.5 | |
Rated peak value withstand current | kA | 40 | 50 | 40 | 50 | 63 | 50 | 63 | 80 | |
Rated short-time withstand current duration |
Master knife/ground knife |
s | 4/2 | |||||||
Creep age distance | mm | 300~380 | ||||||||
Mechanical life | Times | 2000 |
Use forklifts and cranes to load the goods onto the truck
Shenheng Power Equipment CO., LTD is a company specializing in the production of high and low voltage switch power transmission and distribution equipment and high, low voltage electrical components, one of the professional production enterprises, the production of all fully insulated and fully sealed inflatable cabinet, intelligent solid insulation ring main unit, outdoor high voltage cable branch box, box-type substation, etc. Product quality is stable, reliable, It is deeply trusted and approved by the customers.
Manufacturing of the main products are YBW box-type substation, KYN61-40.5, KYN28A - 24, KYN28A - 12, XGN2-10, HXGN-10 high voltage switchgear, XGN ring net cabinet, SHSRM inflatable ring main unit, SHSG solid ring main unit, MNS, GCS, GCS, GGD, XL low voltage switchgear , vacuum circuit breaker , oil immersed transformer , dry type transformer , current /potential transformer,load break switch,solar inverter and other transmission and distribution equipment.
For a long time also for all kinds of metallurgy, shipbuilding, electric power, mining, and intelligent buildings, high-rise buildings, hospitals, schools and other industries to provide high quality power transmission and distribution of complete sets of equipment and electrical control equipment. The company has a strong technical force, sophisticated technology and sophisticated testing methods, and the products sell well across the country.
1. Are you a trading company or manufacturer ?
We are a professional factory with 10 years experience in the field of High and low Voltage switch-gears, Substation,transformers,cable distribution box and various electrical equipment, such as vacuum circuit breaker , load break switch etc.Our
factory is the excellent supplier of State Grid Corporation of China .
2. Do you accept customized service ?
We offer OEM/ODM service , can print your logo on product . our professional technical and quotation team can provide a satisfied
project according to your drawing and parameters .
3. What is your MOQ?
Our MOQ is 1 piece.
4. How long is your delivery lead time ?
It depends on your product requirement and quantity . Generally , 5~10 working days is available .
5. How do you solve quality problems?
Please provide detailed photos of quality problems. our technical and quality testing department will analyse.we will make a
satisfied solution within 2 days .
6. What is your payment terms ?
30%T/T in advance,70% before shipment . West union , L/C are also acceptable .
Suppliers with verified business licenses